perm filename N78JU3.OUT[PRO,HE] blob
sn#524907 filedate 1980-07-25 generic text, type C, neo UTF8
COMMENT ā VALID 00032 PAGES
C REC PAGE DESCRIPTION
C00001 00001
C00005 00002 GRANT STATUS for NSF-78 at the end of 04/80
C00007 00003 PROJECTION for NSF-78 for the month 05/80
C00011 00004 PROJECTION for NSF-78 for the month 06/80
C00015 00005 PROJECTION for NSF-78 for the month 07/80
C00019 00006 PROJECTION for NSF-78 for the month 08/80
C00023 00007 PROJECTION for NSF-78 for the month 09/80
C00026 00008 PROJECTION for NSF-78 for the month 10/80
C00029 00009 PROJECTION for NSF-78 for the month 11/80
C00032 00010 PROJECTION for NSF-78 for the month 12/80
C00035 00011 PROJECTION for NSF-78 for the month 01/81
C00038 00012 PROJECTION for NSF-78 for the month 02/81
C00041 00013 Summary of BINFORD on NSF-78 from 05/80 thru 02/81
C00043 00014 Summary of EARNEST on NSF-78 from 05/80 thru 02/81
C00044 00015 Summary of SOROKA on NSF-78 from 05/80 thru 02/81
C00046 00016 Summary of HAYES on NSF-78 from 05/80 thru 02/81
C00048 00017 Summary of POOR on NSF-78 from 05/80 thru 02/81
C00050 00018 Summary of FROST on NSF-78 from 05/80 thru 02/81
C00052 00019 Summary of GINI-G on NSF-78 from 05/80 thru 02/81
C00053 00020 Summary of GINI-M on NSF-78 from 05/80 thru 02/81
C00054 00021 Summary of COX on NSF-78 from 05/80 thru 02/81
C00055 00022 Summary of GOLDMAN on NSF-78 from 05/80 thru 02/81
C00056 00023 Summary of LOWE on NSF-78 from 05/80 thru 02/81
C00057 00024 Summary of MAPLES on NSF-78 from 05/80 thru 02/81
C00058 00025 Summary of MUJTABA on NSF-78 from 05/80 thru 02/81
C00059 00026 Summary of SALISBURY on NSF-78 from 05/80 thru 02/81
C00060 00027 Summary of BAKER on NSF-78 from 05/80 thru 02/81
C00061 00028 Summary of BLICHER on NSF-78 from 05/80 thru 02/81
C00062 00029 Summary of RUBLEE on NSF-78 from 05/80 thru 02/81
C00063 00030 Summary of SIROKER on NSF-78 from 05/80 thru 02/81
C00065 00031 Summary of ALLEN on NSF-78 from 05/80 thru 02/81
C00066 00032 Summary of REFUND on NSF-78 from 05/80 thru 02/81
C00067 ENDMK
Cā;
GRANT STATUS for NSF-78 at the end of 04/80
To Date Budgeted Remaining
------- -------- ---------
SALARIES AND WAGES 191413.36 270137.00 78723.64
STAFF BENEFITS 37074.59 56594.00 19519.41
CAPITAL EXPENDITURES 0.00 17405.00 17405.00
TRAVEL 6221.18 13000.00 6778.82
EXPENDABLE MATERIALS 29289.06 29000.00 289.06-
INDIRECT COSTS 153118.96 213864.00 60745.03
TOTAL 417117.15 600000.00 182882.85
PROJECTION for NSF-78 for the month 05/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:04
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 52 % of 2736.00 1422.72
EARNEST 10 % of 3527.00 352.69
SOROKA 100% of 1870.00 1870.00
HAYES 30 % of 2125.00 637.50
POOR 25 % of 1802.00 450.50
FROST 30 % of 1948.00 584.40
GINI-G 100% of 500.00 500.00
GINI-M 100% of 500.00 500.00
COX 50 % of 994.00 497.00
GOLDMAN 50 % of 1074.00 537.00
LOWE 35 % of 1074.00 375.90
MAPLES 25 % of 994.00 248.50
MUJTABA 50 % of 1074.00 537.00
SALISBURY 50 % of 1074.00 537.00
BAKER 50 % of 1285.34 642.67
BLICHER 50 % of 936.00 468.00
RUBLEE 50 % of 953.32 476.66
SIROKER 60 % of 1090.00 654.00
ALLEN 15 % of 1692.00 253.80
----------
TOTAL SALARIES AND WAGES 11545.35 202958.70 270137.00 67178.29
STAFF BENEFITS at 0.192 2216.70 39291.29 56594.00 17302.70
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 0.00 17405.00 17405.00
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 6221.18 13000.00 6778.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
RETRO-SAIL-COST-CENTER 1548.00
----------
TOTAL FOR EXPENDABLE MATERIALS 4546.00 33835.06 29000.00 4835.06-
INDIRECT COSTS at 0.58 10618.67 163737.63 213864.00 50126.36
---------- --------- --------- ---------
TOTAL COSTS 28926.73 446043.88 600000.00 153956.11
PROJECTION for NSF-78 for the month 06/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:06
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 52 % of 2736.00 1422.72
EARNEST 5 % of 3527.00 176.34
SOROKA 100% of 1870.00 1870.00
HAYES 5 % of 2125.00 106.25
POOR 5 % of 1802.00 90.09
FROST 5 % of 1948.00 97.40
GINI-G 100% of 500.00 500.00
GINI-M 100% of 500.00 500.00
COX 50 % of 994.00 497.00
GOLDMAN 50 % of 1074.00 537.00
LOWE 35 % of 1074.00 375.90
MAPLES 25 % of 994.00 248.50
MUJTABA 50 % of 1074.00 537.00
SALISBURY 50 % of 1074.00 537.00
BAKER 50 % of 1285.34 642.67
BLICHER 50 % of 936.00 468.00
RUBLEE 50 % of 953.32 476.66
SIROKER 60 % of 1090.00 654.00
ALLEN 10 % of 1692.00 169.19
REFUND 100% of 8818.00- 8818.00-
----------
TOTAL SALARIES AND WAGES 1087.75 204046.45 270137.00 66090.54
STAFF BENEFITS at 0.192 208.84 39500.14 56594.00 17093.85
CAPITAL EXPENDITURES
COMPUTER 27690.00
----------
TOTAL FOR CAPITAL EXPENDITURES 27690.00 27690.00 17405.00 10285.00-
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 6221.18 13000.00 6778.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
BIS-MOVING-EXPENSES 596.00
----------
TOTAL FOR EXPENDABLE MATERIALS 3594.00 37429.06 29000.00 8429.06-
INDIRECT COSTS at 0.58 2836.54 166574.18 213864.00 47289.81
---------- --------- --------- ---------
TOTAL COSTS 35417.14 481461.02 600000.00 118538.97
PROJECTION for NSF-78 for the month 07/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:08
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 2736.00 191.52
EARNEST 5 % of 3527.00 176.34
SOROKA 100% of 1870.00 1870.00
HAYES 5 % of 2125.00 106.25
POOR 5 % of 1802.00 90.09
FROST 5 % of 1948.00 97.40
GINI-G 100% of 500.00 500.00
GINI-M 100% of 500.00 500.00
COX 100% of 994.00 994.00
GOLDMAN 100% of 1074.00 1074.00
MUJTABA 100% of 1074.00 1074.00
SALISBURY 50 % of 1074.00 537.00
RUBLEE 0 % of 953.32 0.00
SIROKER 21 % of 1090.00 228.90
ALLEN 10 % of 1692.00 169.19
----------
TOTAL SALARIES AND WAGES 7608.72 211655.18 270137.00 58481.82
STAFF BENEFITS at 0.192 1460.87 40961.01 56594.00 15632.98
CAPITAL EXPENDITURES
ADAC 1380.00
----------
TOTAL FOR CAPITAL EXPENDITURES 1380.00 29070.00 17405.00 11665.00-
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 6221.18 13000.00 6778.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 2998.00 40427.06 29000.00 11427.06-
INDIRECT COSTS at 0.58 6999.20 173573.38 213864.00 40290.61
---------- --------- --------- ---------
TOTAL COSTS 20446.79 501907.82 600000.00 98092.17
PROJECTION for NSF-78 for the month 08/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:09
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 2736.00 191.52
EARNEST 5 % of 3527.00 176.34
SOROKA 100% of 1870.00 1870.00
HAYES 5 % of 2125.00 106.25
POOR 5 % of 1802.00 90.09
FROST 5 % of 1948.00 97.40
GINI-G 100% of 500.00 500.00
GINI-M 100% of 500.00 500.00
COX 100% of 994.00 994.00
GOLDMAN 100% of 1074.00 1074.00
MUJTABA 100% of 1074.00 1074.00
SALISBURY 50 % of 1074.00 537.00
RUBLEE 0 % of 953.32 0.00
SIROKER 21 % of 1090.00 228.90
ALLEN 10 % of 1692.00 169.19
----------
TOTAL SALARIES AND WAGES 7608.72 219263.90 270137.00 50873.09
STAFF BENEFITS at 0.192 1460.87 42421.89 56594.00 14172.10
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 29070.00 17405.00 11665.00-
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 6221.18 13000.00 6778.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 2998.00 43425.06 29000.00 14425.06-
INDIRECT COSTS at 0.58 6999.20 180572.59 213864.00 33291.40
---------- --------- --------- ---------
TOTAL COSTS 19066.79 520974.62 600000.00 79025.37
PROJECTION for NSF-78 for the month 09/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:11
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 3009.59 210.67
SOROKA 50 % of 2057.00 1028.50
HAYES 5 % of 2337.50 116.87
POOR 5 % of 1982.19 99.10
FROST 5 % of 2142.80 107.13
GINI-G 50 % of 500.00 250.00
GINI-M 50 % of 500.00 250.00
COX 100% of 994.00 994.00
GOLDMAN 100% of 1074.00 1074.00
MUJTABA 100% of 1074.00 1074.00
SALISBURY 50 % of 1074.00 537.00
RUBLEE 0 % of 1048.65 0.00
SIROKER 21 % of 1199.00 251.79
----------
TOTAL SALARIES AND WAGES 5993.08 225256.98 270137.00 44880.01
STAFF BENEFITS at 0.21 1258.54 43680.44 56594.00 12913.55
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 29070.00 17405.00 11665.00-
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 6221.18 13000.00 6778.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 2998.00 46423.06 29000.00 17423.06-
INDIRECT COSTS at 0.58 5944.78 186517.38 213864.00 27346.61
---------- --------- --------- ---------
TOTAL COSTS 16194.42 537169.05 600000.00 62830.94
PROJECTION for NSF-78 for the month 10/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:13
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 3009.59 210.67
SOROKA 50 % of 2057.00 1028.50
HAYES 5 % of 2337.50 116.87
POOR 5 % of 1982.19 99.10
FROST 5 % of 2142.80 107.13
SIROKER 21 % of 1199.00 251.79
----------
TOTAL SALARIES AND WAGES 1814.08 227071.07 270137.00 43065.92
STAFF BENEFITS at 0.21 380.95 44061.40 56594.00 12532.60
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 29070.00 17405.00 11665.00-
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 6221.18 13000.00 6778.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 2998.00 49421.06 29000.00 20421.06-
INDIRECT COSTS at 0.58 3011.96 189529.34 213864.00 24334.65
---------- --------- --------- ---------
TOTAL COSTS 8205.01 545374.06 600000.00 54625.93
PROJECTION for NSF-78 for the month 11/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:16
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 3009.59 210.67
SOROKA 50 % of 2057.00 1028.50
HAYES 5 % of 2337.50 116.87
POOR 5 % of 1982.19 99.10
FROST 5 % of 2142.80 107.13
SIROKER 21 % of 1223.00 256.83
----------
TOTAL SALARIES AND WAGES 1819.12 228890.20 270137.00 41246.79
STAFF BENEFITS at 0.21 382.01 44443.41 56594.00 12150.58
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 29070.00 17405.00 11665.00-
TRAVEL
CADcAM 800.00
----------
TOTAL FOR TRAVEL 800.00 7021.18 13000.00 5978.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 2998.00 52419.06 29000.00 23419.06-
INDIRECT COSTS at 0.58 3479.50 193008.85 213864.00 20855.14
---------- --------- --------- ---------
TOTAL COSTS 9478.64 554852.71 600000.00 45147.28
PROJECTION for NSF-78 for the month 12/80
Prepared by MAS using BUDGET on 07/25/80 at 10:18:19
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 3009.59 210.67
SOROKA 50 % of 2057.00 1028.50
HAYES 5 % of 2337.50 116.87
POOR 5 % of 1982.19 99.10
FROST 5 % of 2142.80 107.13
SIROKER 21 % of 1223.00 256.83
----------
TOTAL SALARIES AND WAGES 1819.12 230709.33 270137.00 39427.67
STAFF BENEFITS at 0.21 382.01 44825.43 56594.00 11768.56
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 29070.00 17405.00 11665.00-
TRAVEL
IJCPR 850.00
----------
TOTAL FOR TRAVEL 850.00 7871.18 13000.00 5128.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1548.00
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 2998.00 55417.06 29000.00 26417.06-
INDIRECT COSTS at 0.58 3508.50 196517.35 213864.00 17346.64
---------- --------- --------- ---------
TOTAL COSTS 9557.64 564410.36 600000.00 35589.64
PROJECTION for NSF-78 for the month 01/81
Prepared by MAS using BUDGET on 07/25/80 at 10:18:24
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 3009.59 210.67
SOROKA 50 % of 2057.00 1028.50
HAYES 5 % of 2337.50 116.87
POOR 5 % of 1982.19 99.10
FROST 5 % of 2142.80 107.13
SIROKER 21 % of 1223.00 256.83
----------
TOTAL SALARIES AND WAGES 1819.12 232528.45 270137.00 37608.54
STAFF BENEFITS at 0.21 382.01 45207.44 56594.00 11386.55
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 29070.00 17405.00 11665.00-
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 7871.18 13000.00 5128.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1702.80
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 3152.80 58569.86 29000.00 29569.85-
INDIRECT COSTS at 0.58 3105.28 199622.64 213864.00 14241.35
---------- --------- --------- ---------
TOTAL COSTS 8459.23 572869.58 600000.00 27130.41
PROJECTION for NSF-78 for the month 02/81
Prepared by MAS using BUDGET on 07/25/80 at 10:18:25
This Month To Date Budgeted Remaining
---------- ------- -------- ---------
SALARIES AND WAGES
BINFORD 7 % of 3009.59 210.67
SOROKA 50 % of 2057.00 1028.50
HAYES 5 % of 2337.50 116.87
POOR 5 % of 1982.19 99.10
FROST 5 % of 2142.80 107.13
SIROKER 21 % of 1223.00 256.83
----------
TOTAL SALARIES AND WAGES 1819.12 234347.58 270137.00 35789.41
STAFF BENEFITS at 0.21 382.01 45589.46 56594.00 11004.53
CAPITAL EXPENDITURES
----------
TOTAL FOR CAPITAL EXPENDITURES 0.00 29070.00 17405.00 11665.00-
TRAVEL
----------
TOTAL FOR TRAVEL 0.00 7871.18 13000.00 5128.82
EXPENDABLE MATERIALS
SAIL-COST-CENTER 1702.80
AVERAGE-EXPENDABLE-MATERIALS 1450.00
----------
TOTAL FOR EXPENDABLE MATERIALS 3152.80 61722.65 29000.00 32722.65-
INDIRECT COSTS at 0.58 3105.28 202727.93 213864.00 11136.07
---------- --------- --------- ---------
TOTAL COSTS 8459.23 581328.82 600000.00 18671.17
Summary of BINFORD on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 52 % of 2736.00 1422.72 1422.72
06/80 52 % of 2736.00 1422.72 2845.44
07/80 7 % of 2736.00 191.52 3036.96
08/80 7 % of 2736.00 191.52 3228.48
09/80 7 % of 3009.59 210.67 3439.15
10/80 7 % of 3009.59 210.67 3649.82
11/80 7 % of 3009.59 210.67 3860.49
12/80 7 % of 3009.59 210.67 4071.16
01/81 7 % of 3009.59 210.67 4281.84
02/81 7 % of 3009.59 210.67 4492.51
Summary of EARNEST on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 10 % of 3527.00 352.69 352.69
06/80 5 % of 3527.00 176.34 529.04
07/80 5 % of 3527.00 176.34 705.39
08/80 5 % of 3527.00 176.34 881.74
09/80
10/80
11/80
12/80
01/81
02/81
Summary of SOROKA on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 100% of 1870.00 1870.00 1870.00
06/80 100% of 1870.00 1870.00 3740.00
07/80 100% of 1870.00 1870.00 5610.00
08/80 100% of 1870.00 1870.00 7480.00
09/80 50 % of 2057.00 1028.50 8508.50
10/80 50 % of 2057.00 1028.50 9537.00
11/80 50 % of 2057.00 1028.50 10565.50
12/80 50 % of 2057.00 1028.50 11594.00
01/81 50 % of 2057.00 1028.50 12622.50
02/81 50 % of 2057.00 1028.50 13651.00
Summary of HAYES on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 30 % of 2125.00 637.50 637.50
06/80 5 % of 2125.00 106.25 743.75
07/80 5 % of 2125.00 106.25 850.00
08/80 5 % of 2125.00 106.25 956.25
09/80 5 % of 2337.50 116.87 1073.12
10/80 5 % of 2337.50 116.87 1190.00
11/80 5 % of 2337.50 116.87 1306.87
12/80 5 % of 2337.50 116.87 1423.75
01/81 5 % of 2337.50 116.87 1540.62
02/81 5 % of 2337.50 116.87 1657.50
Summary of POOR on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 25 % of 1802.00 450.50 450.50
06/80 5 % of 1802.00 90.09 540.60
07/80 5 % of 1802.00 90.09 630.70
08/80 5 % of 1802.00 90.09 720.79
09/80 5 % of 1982.19 99.10 819.90
10/80 5 % of 1982.19 99.10 919.02
11/80 5 % of 1982.19 99.10 1018.13
12/80 5 % of 1982.19 99.10 1117.23
01/81 5 % of 1982.19 99.10 1216.34
02/81 5 % of 1982.19 99.10 1315.45
Summary of FROST on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 30 % of 1948.00 584.40 584.40
06/80 5 % of 1948.00 97.40 681.80
07/80 5 % of 1948.00 97.40 779.20
08/80 5 % of 1948.00 97.40 876.60
09/80 5 % of 2142.80 107.13 983.74
10/80 5 % of 2142.80 107.13 1090.88
11/80 5 % of 2142.80 107.13 1198.02
12/80 5 % of 2142.80 107.13 1305.16
01/81 5 % of 2142.80 107.13 1412.30
02/81 5 % of 2142.80 107.13 1519.44
Summary of GINI-G on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 100% of 500.00 500.00 500.00
06/80 100% of 500.00 500.00 1000.00
07/80 100% of 500.00 500.00 1500.00
08/80 100% of 500.00 500.00 2000.00
09/80 50 % of 500.00 250.00 2250.00
10/80
11/80
12/80
01/81
02/81
Summary of GINI-M on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 100% of 500.00 500.00 500.00
06/80 100% of 500.00 500.00 1000.00
07/80 100% of 500.00 500.00 1500.00
08/80 100% of 500.00 500.00 2000.00
09/80 50 % of 500.00 250.00 2250.00
10/80
11/80
12/80
01/81
02/81
Summary of COX on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 50 % of 994.00 497.00 497.00
06/80 50 % of 994.00 497.00 994.00
07/80 100% of 994.00 994.00 1988.00
08/80 100% of 994.00 994.00 2982.00
09/80 100% of 994.00 994.00 3976.00
10/80
11/80
12/80
01/81
02/81
Summary of GOLDMAN on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 50 % of 1074.00 537.00 537.00
06/80 50 % of 1074.00 537.00 1074.00
07/80 100% of 1074.00 1074.00 2148.00
08/80 100% of 1074.00 1074.00 3222.00
09/80 100% of 1074.00 1074.00 4296.00
10/80
11/80
12/80
01/81
02/81
Summary of LOWE on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 35 % of 1074.00 375.90 375.90
06/80 35 % of 1074.00 375.90 751.80
07/80
08/80
09/80
10/80
11/80
12/80
01/81
02/81
Summary of MAPLES on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 25 % of 994.00 248.50 248.50
06/80 25 % of 994.00 248.50 497.00
07/80
08/80
09/80
10/80
11/80
12/80
01/81
02/81
Summary of MUJTABA on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 50 % of 1074.00 537.00 537.00
06/80 50 % of 1074.00 537.00 1074.00
07/80 100% of 1074.00 1074.00 2148.00
08/80 100% of 1074.00 1074.00 3222.00
09/80 100% of 1074.00 1074.00 4296.00
10/80
11/80
12/80
01/81
02/81
Summary of SALISBURY on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 50 % of 1074.00 537.00 537.00
06/80 50 % of 1074.00 537.00 1074.00
07/80 50 % of 1074.00 537.00 1611.00
08/80 50 % of 1074.00 537.00 2148.00
09/80 50 % of 1074.00 537.00 2685.00
10/80
11/80
12/80
01/81
02/81
Summary of BAKER on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 50 % of 1285.34 642.67 642.67
06/80 50 % of 1285.34 642.67 1285.34
07/80
08/80
09/80
10/80
11/80
12/80
01/81
02/81
Summary of BLICHER on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 50 % of 936.00 468.00 468.00
06/80 50 % of 936.00 468.00 936.00
07/80
08/80
09/80
10/80
11/80
12/80
01/81
02/81
Summary of RUBLEE on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 50 % of 953.32 476.66 476.66
06/80 50 % of 953.32 476.66 953.32
07/80 0 % of 953.32 0.00 953.32
08/80 0 % of 953.32 0.00 953.32
09/80 0 % of 1048.65 0.00 953.32
10/80
11/80
12/80
01/81
02/81
Summary of SIROKER on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 60 % of 1090.00 654.00 654.00
06/80 60 % of 1090.00 654.00 1308.00
07/80 21 % of 1090.00 228.90 1536.90
08/80 21 % of 1090.00 228.90 1765.80
09/80 21 % of 1199.00 251.79 2017.59
10/80 21 % of 1199.00 251.79 2269.38
11/80 21 % of 1223.00 256.83 2526.21
12/80 21 % of 1223.00 256.83 2783.04
01/81 21 % of 1223.00 256.83 3039.87
02/81 21 % of 1223.00 256.83 3296.70
Summary of ALLEN on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80 15 % of 1692.00 253.80 253.80
06/80 10 % of 1692.00 169.19 423.00
07/80 10 % of 1692.00 169.19 592.20
08/80 10 % of 1692.00 169.19 761.39
09/80
10/80
11/80
12/80
01/81
02/81
Summary of REFUND on NSF-78 from 05/80 thru 02/81
month salary this month to-date
----- ------ ---------- -------
05/80
06/80 100% of 8818.00- 8818.00- 8818.00-
07/80
08/80
09/80
10/80
11/80
12/80
01/81
02/81